Identification of opportunities to reduce electricity consumption per process during scheduled shutdowns at mineral processing plants using Pareto and sensitivity analysis

Authors

  • María Fernanda Revilla Aliaga Ninguna , National University of Trujillo image/svg+xml
  • Denilson Singona Conde National University of Saint Anthony the Abbot in Cuzco image/svg+xml

DOI:

https://doi.org/10.17268/jamm.2026.009

Keywords:

residual electricity consumption, plant shutdowns, mineral processing, Pareto analysis, energy sensitivity

Abstract

Electricity consumption during shutdowns at mining and mineral processing facilities was assessed using a comparative literature review and deterministic sensitivity models. Four published case studies from Tanzania, Canada, South Africa and Chile were examined. Two of these supported the main calculations, whilst the other two provided methodological context and insights into data availability. Data were collected on energy demand, daily electricity consumption, the duration of outages, the unit cost of supply and consumption by region. Energy balances, Pareto analysis, area retention ratios and reduction scenarios were applied. For Chilalo, annual maintenance and shutdown consumption was estimated at 988 megawatt hours, with an associated cost of 217360 United States dollars. For Kiena, equivalent mean shutdown power was calculated at 570.83 kilowatts. Two areas accounted for 80.3 percent of shutdown electricity use. When grinding was excluded from the operating denominator, the retained consumption ratio increased from 25.5 to 52.3 percent. A hypothetical ten percent reduction in both Chilalo shutdown power and accumulated duration resulted in a nineteen percent decrease in electricity attributed to shutdowns. Prioritization was found to depend on both energy contribution and the technically reducible fraction. Differences in measurement boundaries and operating conditions prevented efficiency ranking across mines. Scenario results were interpreted as conditional estimates rather than verified savings. A disconnection threshold model was also formulated to account for additional shutdown and restart energy.

Published

2026-11-14

Issue

Section

Original Articles

Categories

How to Cite

Identification of opportunities to reduce electricity consumption per process during scheduled shutdowns at mineral processing plants using Pareto and sensitivity analysis. (2026). Journal of Advanced Mining Modeling, 2(2). https://doi.org/10.17268/jamm.2026.009