Asmat U., R., Vergara M., E., & Gutiérrez S., F. (2019). Measures of robustness and stability to scheduling problems with uncertainty: A review of the state of the art. Selecciones Matemáticas, 6(02), 297-310. https://doi.org/10.17268/sel.mat.2019.02.16