[1]
Asmat U., R., Vergara M., E. and Gutiérrez S., F. 2019. Measures of robustness and stability to scheduling problems with uncertainty: A review of the state of the art. Selecciones Matemáticas. 6, 02 (Dec. 2019), 297-310. DOI:https://doi.org/10.17268/sel.mat.2019.02.16.